Search for a transit camp in Mumbai and you will meet two different ideas under one name. In the redevelopment world, a transit camp is temporary housing for residents while their old building or slum cluster is rebuilt. In construction and industrial work, the same phrase is used for the temporary accommodation a contractor sets up for its workforce next to a site. This guide covers the second meaning: workforce and site camps, and the prefabricated transit accommodation used to build them.
Aadyaan Infrastructure Pvt. Ltd. offers workforce accommodation as a B2B service for construction companies, EPC contractors and industrial projects. We do not describe any tenant-rehousing project here, and nothing on this page should be read as a claim to have built one. If you are a resident or a society looking for transit housing during redevelopment, the agencies named below are the right starting point.
Transit camp in Mumbai: two meanings, one scope for this page
Meaning 1: transit camps for residents during redevelopment
The Maharashtra Housing and Area Development Authority (MHADA) describes how, when an old cessed building is reconstructed, its tenants are temporarily shifted to the board’s transit camp tenements and rehoused once the new building is ready. Slum redevelopment schemes use a similar idea, where the developer provides transit accommodation or pays transit rent until permanent homes are handed over. These are housing and tenancy matters, run through MHADA, the Slum Rehabilitation Authority and the developer. That is a separate subject from this guide.
Meaning 2: workforce and site camps
On a construction or industrial project, a transit camp is the temporary village that houses workers near the job: sleeping blocks, toilets and bathing areas, a kitchen and dining space, a site office, first-aid room, water and power, and security at the gate. It exists for the duration of the project and is removed afterwards. Searchers use several phrases for it: labour camp, workforce accommodation, site camp, porta cabin colony. When we say transit camp in Mumbai from here on, we mean this meaning.
The transit camp service at Aadyaan covers modular and portable accommodation, sanitation blocks, kitchens, site offices and security arrangements. The sections below explain what such a camp must contain, how to lay it out, what it is built from, and how to compare quotations without being misled by headline unit rates.
Labour camp requirements: what the rules and your client expect
Treat this section as orientation, not legal advice. Labour law in India changed substantially over the past year, and clause numbers have moved. Always confirm the current text with the labour department or your legal adviser before you finalise a camp design or sign a contract.
The older framework that shaped site practice
For roughly three decades, welfare on construction sites was governed by the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996, with the Contract Labour (Regulation and Abolition) Act, 1970 applying to workers engaged through contractors. Maharashtra framed its own Building and Other Construction Workers Rules in 2007. In the 1996 Act, Chapter VI lists the welfare measures: safe drinking water (section 32), latrines and urinals (section 33), temporary living accommodation (section 34), crèches (section 35), first aid (section 36) and canteens (section 37).
Section 34 is the one that shapes camp design. It asks the employer to provide temporary living accommodation free of charge, within the work site or as near to it as possible, for as long as the work is in progress. That accommodation must have separate cooking, bathing, washing and lavatory facilities. When the work ends, the employer must remove the temporary structures at its own cost and restore the ground. Section 32 adds that drinking-water points must be labelled in a language workers understand, and that no point may sit within six metres of a washing place, urinal or latrine.
The OSH Code and the 2026 Central Rules
The Occupational Safety, Health and Working Conditions Code, 2020 was brought into force on 21 November 2025, together with the other three labour codes. It consolidates thirteen earlier laws, a list that includes the 1996 construction workers’ Act, the Contract Labour Act, the Inter-State Migrant Workmen Act and the Factories Act, 1948. The Central Rules under the Code were notified on 8 May 2026 and supersede, among others, the 1998 Central rules for building workers.
As reproduced in published commentary on those Central Rules, the construction-relevant provisions include: suitable temporary living accommodation free of charge where workers come from distant places and adequate transport is not available; at least one latrine for every 25 male and every 15 female workers and one urinal for every 15 males, with mobile toilets where required; a canteen where 100 or more workers, including contract labour, are ordinarily employed; a crèche where more than fifty workers are employed; and an ambulance room where more than 500 are employed. Rule numbers and thresholds in secondary sources can differ, so verify each against the gazette text.
Maharashtra released draft state rules under the Code in spring 2026, and we could not confirm whether they have since been finalised. Until you have checked, plan to the stricter of the old state practice, the Central Rules and your client’s own EHS specification. Many principal employers write camp standards into tender documents, and those standards often exceed the statutory minimum.
Requirement-to-design table
| Item | What the framework generally asks (verify) | What it means for camp design |
|---|---|---|
| Drinking water | Labelled points; none within 6 m of washing places, urinals or latrines | Place tanks and coolers on the clean side of the camp; covered storage; cleaning schedule |
| Latrines and urinals | Ratios per head, separate for women; mobile units where needed | Count from peak headcount, not average; ventilated, lit, with water points |
| Living accommodation | Free, near the work, with separate cooking, bathing, washing and lavatory facilities | Zone the camp; no cooking in sleeping rooms |
| Canteen | Required above a headcount threshold; separate from latrines | Dining hall, kitchen and store on a non-combustible footprint, away from sanitation |
| Crèche | Above a threshold of women workers | Reserve a room and its services if the crew includes families |
| First aid and medical | First-aid boxes; larger medical room at high headcounts | First-aid room near the gate for ambulance access |
| Drills and emergencies | Mock drills reported at quarterly intervals | Assembly point, two exits per block, extinguisher spacing |
| Removal after work | Structures removed and ground restored | Design for dismantling; bolted connections; record the pre-camp site condition |
Layout planning for a transit camp in Mumbai: density, ventilation and separation
A camp is a small settlement, and most of its failures come from layout rather than from the cabins themselves. Good layout is cheap to fix on paper and expensive to fix after 150 people have moved in. Start with the zoning, then work inward.
Choose the plot and orient the camp
- Pick ground above the local flood line, away from open excavations, crane swing zones, overhead lines, transformers and fuel stores.
- Study the monsoon runoff path. Mumbai receives well over 2,000 mm of rain a year, most of it between June and September, so water must have a way out of the camp that does not pass through the sleeping area.
- Keep one vehicle route from the gate to the kitchen store and the sanitation block for supplies and desludging, so lorries never cross the dormitory zone.
Zoning, from gate to back edge
A sensible sequence is gate and security cabin, then site office and first-aid room, then dining and kitchen, then sleeping blocks, with washing, drying yards and toilets on the downwind edge. This keeps visitors and deliveries out of private areas and keeps smells and wastewater away from food and water. Whatever minimum separation the applicable rules prescribe between drinking-water points, kitchens and latrines is a floor, not a target; in practice give kitchens and water points generous distance from sanitation.
Density and ventilation
The floor area per worker is fixed by the applicable rules and your client’s specification, so ask for the figure in writing and do not design below it. Within that, think about how the room is used. Double-deck bunks save floor area but need ceiling height, a ladder, a guard on the upper bunk and a fan that does not hit a sleeping head. Allow circulation space between rows, lockers for each worker and at least two exits from each block.
For ventilation, provide openings on opposite walls so that air actually crosses the room, add ridge or roof ventilators in warm months, and fit insect mesh on every opening. In Mumbai’s humid summers, a camp that only has a door and one window becomes unbearable by afternoon, and workers will rig their own openings, usually unsafely.
Fire points, first aid and emergency access
Place extinguishers at each block entrance, in the kitchen and near the electrical panel. Mark one assembly point in open ground, keep a clear fire-tender route from the gate, and put the first-aid room close to the gate so an ambulance can reach it without crossing the camp. The construction safety guide for live sites covers how camp rules fit into the wider site safety plan.
Labour camp construction: modular and portable options
Most modular site camp designs use one of three systems: sandwich-panel cabins, light steel-frame structures with sheet cladding, or converted shipping containers. Each suits a different duration, budget and level of comfort. The table compares them for Mumbai conditions.
| System | Strengths | Limits in Mumbai conditions | Suited to |
|---|---|---|---|
| Sandwich-panel cabins on a steel base frame | Fast erection; factory-finished; panels can be unbolted and reused; insulated core reduces heat gain | Joint leaks in heavy rain if sealing is poor; metal skins heat up without roof shade; combustible cores (PUF, EPS) need care near kitchens | Medium-duration camps, offices, dormitories |
| Light MS frame with sheet roof and cladding | Flexible spans and layouts; can be fabricated in a workshop and bolted on site; easy to extend | Hot unless insulated and ventilated; needs protective coating against humid, salty air; leaks at fasteners if not maintained | Larger dormitories, dining halls, stores, kitchens |
| Converted shipping containers | Strong and stackable; easy to transport and relocate; secure for offices and stores | Hottest option without insulation and shading; condensation; modification and cut-outs need structural care; corrosion at cut edges | Site offices, stores, short-duration housing with insulation |
| Masonry or RCC temporary blocks | Thermally comfortable; permanent look | Slow, not reusable, dismantling creates debris; hard to justify for short projects | Very long projects where the camp doubles as later site infrastructure |
Heat, monsoon and salt air
Three Mumbai conditions drive material choice more than anything else. Summer heat on a bare metal roof turns a dormitory into an oven, so specify an insulated roof, a reflective finish, an air gap or a second shading roof, and cross-ventilation. Monsoon rain tests every joint, so use proper flashings, sealed fasteners and a plinth high enough to keep floors dry. Salt-laden air near the coast attacks unprotected steel, so ask for hot-dip galvanised or properly coated frames and fasteners, and plan for periodic touch-up.
Fire performance of panel cores
Not all sandwich panels behave alike in a fire. Panels with mineral-wool or similar non-combustible cores perform differently from those with foam cores. Ask the supplier for the core type and for test documentation, and keep kitchens, electrical rooms and generator areas in non-combustible construction regardless of what the dormitories use. Where you are already planning steel for other works, our heavy structure works team fabricates MS frames and supports at the Ghatkopar workshop, which can also be used for camp frames and platforms.
Porta cabin cost and camp cost: what moves the number
People search for porta cabin cost expecting a single figure. There is no honest single figure, because the same word covers a plain site office and a fully serviced dormitory. We do not quote rates on this page. What matters is understanding the drivers so that two quotations can be compared like for like.
Cost drivers
- Size and count of units: larger clear spans cost more per square metre than repeated small modules.
- Panel and frame specification: core type and thickness, skin thickness and coating, steel weight in the base frame.
- Services built in: plumbing for toilets, electrical points, fans, lighting, air-conditioning in offices.
- Interior fit-out: flooring, doors, windows with mesh, bunks, lockers, furniture.
- Site preparation: levelling, plinth or foundation, drainage, approach road, fencing.
- Transport and erection: distance, crane or hydra, access restrictions for heavy vehicles, working hours.
- Ownership model: purchase, rental or lease with buy-back, and who bears dismantling.
- Duration of use: a camp used for two years justifies more durable specification than one used for four months.
- Compliance extras: fire equipment, first-aid room, water treatment, sewage arrangements.
How to compare two quotations
Ask both bidders to price the same drawing and a written specification. Check that each quote states unit dimensions, panel core and thickness, number of toilets, kitchen fit-out, electrical load, transport and erection, and who pays for dismantling and ground restoration. A low number that leaves out utilities or relocation is not low; it simply moves the cost to your site team later. Our guide on choosing a construction contractor in Mumbai explains the same discipline for building work.
Utilities: water, sanitation, power and lighting
Water
Plan supply for drinking, cooking, bathing and washing separately. Drinking water should meet the drinking-water standard published by the Bureau of Indian Standards (IS 10500), and should be tested at intervals, particularly after the monsoon. Store it in closed tanks with taps, never open drums. Estimate demand from peak headcount and the per-person figure in your client’s specification, and size storage for at least a day of interruption, because municipal supply and tankers are both unpredictable at Mumbai’s site edges.
Sewage and wastewater
Connect to a municipal sewer if one is available at the site boundary. If not, use a septic tank with soak pit or a packaged sewage treatment unit sized for peak occupancy, and arrange regular desludging. Never discharge to storm drains, nalas or open ground. Check the environmental consent conditions attached to the main project, since discharge conditions can extend to the camp. Fit a grease trap between the kitchen and the drain.
Electrical supply and lighting
Camps combine sleeping people, humid air and hurried wiring, so electrical design deserves attention. Take supply from a dedicated panel with earth-leakage protection, run armoured cable or conduit, fit properly earthed sockets and ban improvised extension boards. Provide a generator or standby for fans in summer and for lighting in the monsoon, plus battery emergency lights in corridors. External lighting at gate, pathways, toilets and the assembly point improves safety and security at the same time.
Waste and housekeeping
Provide covered bins with a collection routine, keep drains clear before the monsoon and drain any standing water that can breed mosquitoes. Poor housekeeping is one of the quickest ways for a camp to fail an inspection.
Kitchens and dining
The 1996 Act expected cooking facilities to be separate from sleeping and bathing, and the Central Rules expect a full canteen above a headcount threshold. Whether you run a central mess or let workers cook in groups, the kitchen is the highest fire risk in the camp.
- Build the kitchen as a separate block with non-combustible walls and roof, a hood and exhaust, and good natural ventilation.
- Store LPG cylinders outdoors in a ventilated enclosure away from the kitchen walls, drains and sleeping areas, following the supplier’s safety guidance and your fire officer’s advice.
- Keep the kitchen, store, dining hall and washing area in a logical sequence, with hand-wash basins at the dining entrance.
- Include a grease trap, covered waste bins, pest control and a food store raised off the floor.
- If a contractor runs the mess, check that it holds the food-business licence applicable to it and keep a record of that licence on file.
- Reserve a section of the dining area for women and persons with disabilities where the crew includes them.
Security, access control and fire points
A well-run camp has one controlled entrance, a visitor register, a night watchman and lighting. Pass systems that record who is inside help in emergencies as well as for security. Fence the perimeter, close gaps that let outsiders in, and keep alcohol, open flames and unauthorised cooking out of sleeping blocks through rules that are displayed in the languages your workers speak.
For fire safety, think in layers: detect (smoke or heat alarms in dormitories where feasible), contain (non-combustible construction where cooking or electrical equipment sits), extinguish (portable extinguishers of the right type, sand buckets, a water line) and escape (two exits, clear passages, assembly point). Run drills; the Central Rules as reported call for them quarterly, and drills expose gaps that paper plans miss.
Scaling a transit camp in Mumbai from a small crew to a large workforce
Crews rarely stay the same size. They start small during excavation, peak during structure and finishing, and fall away again at handover. A camp planned around a modular grid can grow and shrink with them. The table shows how the demands change as headcount rises, with statutory thresholds drawn from the reported Central Rules.
| Crew band | Typical set-up | Thresholds and points to watch |
|---|---|---|
| Small (a few dozen) | A handful of sleeping cabins, a shared toilet block, a small kitchen, a site office and a first-aid corner | Water storage and sewage often decide feasibility; mobile toilets may help early on |
| Medium (up to about 100) | Dormitory blocks, separate dining and kitchen, first-aid room, security cabin | Crèche provision above fifty workers if women are employed; canteen threshold approaches at 100 |
| Large (100 to 250) | Full canteen, multiple sanitation blocks, laundry and drying yards, generator, drainage network | Canteen duty applies; safety officers required from 250 workers on construction sites as reported |
| Very large (above 250) | Multi-block camp with internal roads, dedicated medical room, welfare office | Ambulance room above 500 as reported; check state rules for safety committees and officers |
Two design habits make scaling cheap. First, size the main service trunks (water, sewer, power) for the final headcount from day one, so that adding blocks does not mean digging up what you have already built. Second, use a repeating bay so that a new block is a copy of an existing one, with the same foundations, the same connections and the same inspection checklist.
Dismantling, relocation and site restoration
A camp is temporary by definition, so design the exit when you design the entry. Bolted panel and frame connections can be unbolted, numbered and re-erected; welded connections have to be cut and are rarely reused. Use bolted joints wherever structure allows, and keep a drawing that numbers each module.
When the work ends, the employer is expected to remove the temporary structures at its own cost and return the ground in clean, level condition, and land lent by a local authority has to be given back as received. In practice that means decommissioning the soak pit or septic tank, removing foundations and plinths, clearing drains and photographing the site before and after. Record the condition of the plot at handover; it protects you from disputes with the landowner.
If the camp moves to another site, a condition survey of every module at dismantling avoids surprises on arrival. Panels that have survived one monsoon usually need new sealant and fasteners at re-erection, so allow for a refurbishment step before the next deployment. Where an ongoing civil job needs the camp footprint cleared, our civil works team can coordinate groundwork and restoration.
Timeline for a transit camp in Mumbai: from site survey to move-in
How long a camp takes depends on headcount, the system chosen, the state of the plot and whether approvals are needed from the landowner or the project owner. A small camp from approved drawings can often be erected within weeks; a multi-block camp with a sewage treatment unit takes longer. The usual sequence is below.
- Brief and headcount. Peak and average crew, women and family workers, duration of use, client EHS standard.
- Site survey and layout. Levels, drainage, access, services, setbacks from the work front; layout drawing approved by the client.
- Design and procurement. Module schedule, panel and frame specification, fabrication of frames and base units.
- Site preparation. Levelling, compacted base, plinth or foundation, drainage, fencing, utilities trunks.
- Delivery and erection. Transport in permitted hours, lifting, bolting, sealing.
- Services and fit-out. Plumbing, electrical, lighting, fans, bunks, kitchen equipment, signage.
- Inspection and handover. Walk-through against the checklist below, fire equipment check, water test, then occupation in stages.
Monsoon affects both site preparation and delivery. Work that needs open ground, concrete or sealants goes faster in the dry months, so if the project allows, finish plinths and drainage before June. The monsoon-ready structural steel guide explains how rain changes erection planning more broadly.
Workforce accommodation audit checklist for construction sites
Use this list before occupation and then at regular intervals while the camp is in use. It works for a self-audit, a client inspection or a hand-over from one contractor to another.
- Is the written headcount (peak and average) the basis for beds, toilets, water and power?
- Does each sleeping room have cross-ventilation, insect mesh, lighting and two ways out?
- Are cooking, bathing, washing and toilets separate from sleeping areas?
- Are drinking-water points labelled, covered, and clear of washing and sanitation by the required distance?
- Is the toilet count calculated per the applicable ratio, with separate provision for women and for persons with disabilities where needed?
- Is wastewater connected to a sewer or a treatment arrangement that matches the project’s consent conditions?
- Is the electrical supply protected by earth-leakage devices, with no improvised wiring?
- Is the kitchen non-combustible, ventilated, and fitted with a grease trap and fire extinguishers?
- Is LPG stored outdoors in an enclosure away from sleeping blocks and drains?
- Are extinguishers, assembly point and emergency lights in place, and has a drill been recorded?
- Is there a stocked first-aid box, a trained person and a clear route for an ambulance?
- Does the gate have a register, lighting and a watchman?
- Are drains clear and is standing water removed before and during the monsoon?
- Is the roof insulated or shaded, and are joints and fasteners checked for leaks?
- Is there a dismantling plan, a module inventory and a before-camp photo record of the plot?
Next step: send us the brief
To scope a camp, send the project location, the expected headcount (peak and average), the duration, the plot dimensions or a site sketch, the client’s camp or EHS specification if there is one, and the date you need people to move in. If the camp must connect to the main works, share the site layout too. We will respond with a layout proposal and a list of assumptions.
Use our contact page or call +91 98211 99142. To see the kind of work the company reports across Mumbai, Navi Mumbai and Thane, browse the project list, or read about the industrial shed and PEB construction work that often runs alongside a camp.
Frequently asked questions
The phrase has two meanings. In redevelopment, a transit camp is temporary housing for residents while their old building or slum cluster is rebuilt, handled through agencies such as MHADA and the SRA. In construction, it is the temporary accommodation a contractor builds for its workforce near a site. Our transit camp service covers only the second meaning: workforce and site camps for construction companies, EPC contractors and industrial projects.
Workers need safe drinking water, enough latrines and urinals, temporary living accommodation near the site with separate cooking, bathing, washing and lavatory facilities, first aid and, above headcount thresholds, a canteen and crèche. The framework moved from the 1996 construction workers' Act to the OSH Code and its 2026 Central Rules, so confirm current state rules, thresholds and your client's EHS specification before you finalise a design.
There is no single figure, because a porta cabin can be a plain site office or a fully serviced dormitory. Cost depends on size, panel core and thickness, steel frame weight and coating, built-in plumbing and electrical work, fit-out, site preparation, transport, erection, duration of use and whether dismantling is included. Send your headcount and drawings through our contact page and we will describe the assumptions behind any proposal.
It depends on duration and comfort. Sandwich-panel cabins are insulated, factory finished and easy to unbolt and reuse, so they suit dormitories and offices. Containers are strong and easy to relocate but get very hot in Mumbai summers unless insulated and shaded, so they suit stores and offices. Light steel-frame blocks suit large dining halls and dormitories. Whatever you choose, check roof insulation, joint sealing against monsoon rain and corrosion protection.
A small camp from approved drawings can often be erected within weeks, while a multi-block camp with a sewage treatment unit, kitchen and internal drainage takes longer. The main variables are headcount, the state of the plot, approvals from the landowner or project owner, transport windows for heavy vehicles and the monsoon. Finishing plinths, drainage and utility trunks before June usually shortens the schedule noticeably.
Yes, if it was designed for it. Bolted panel and frame connections can be unbolted, numbered and re-erected, while welded joints are cut and rarely reused. Expect new sealant and fasteners at the next site after a monsoon. The employer is also expected to remove temporary structures and restore the ground at the end of the work, so budget for dismantling, site restoration and a before-and-after photo record.
Where women are employed, the framework expects separate latrines and bathing arrangements, and a crèche above a headcount threshold for children under six. Practical design also means separate sleeping blocks or well-separated sections, lighting on the paths between blocks, and a controlled entrance. Check the thresholds and ratios in the current Central Rules, any Maharashtra rules in force and your client's own camp standard.
This page does not claim that. The company's transit-camp service is workforce accommodation for construction companies, EPC contractors and industrial projects, covering modular and portable accommodation, sanitation, kitchens, site offices and security. Tenant transit housing in Mumbai is arranged through bodies such as MHADA, the SRA or the redevelopment developer, so residents and societies should approach them directly.